FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Elevator lobby as vestibule - ASHRAE Standard 90.1

Hi, I have a question concerning the the function of a elevator lobby as a vestibule. Regarding to Standard 90.1, every building entrance that separate cond. space from the exterior has to have an enclosed vestibule. The question now is: Does a lift lobby function as an Standard 90.1-accepted vestibule if the door from the lobby to the exterior fulfills the mandatory door requirements and also the additional interior doors from the lobby to other building areas fulfill the requirements? Are there also requirments on the elevator door itself (air leakage, etc.)? Thanks

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 06/09/2016 - 14:23

Sounds like it would comply. The elevator doors are not exterior so there is no leakage requirement.

Thu, 06/09/2016 - 15:17

Thanks. So am I right in assuming that the Mandatory Provisions of ASHRAE Standard 90.1-2007 for 5.4.3 Air Leakage -> 5.4.3.2 Fenestration and Doors only apply to the exterior doors and windows of a vestibule and not for the inside doors/windows? Are there any requirments on air leakage, etc. for the inside doors/windows of vestibules? Thanks.

Thu, 06/09/2016 - 15:22

Yes I think that is correct. Not that I know of.

Add new comment