FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Service hot water pumps in the baseline

I am doing an ASHRAE 90.1-2007 PRM analysis. We have a DOAS CV laboratory design. Our proposed service hot water (DHW) is an indirect twin coil calorifier being served by the main gas boiler LTHW loop and a second DHW loop served by a CHP unit. The only dedicated DHW pump is a single 1.1kw DHW pump between the CHP and the calorifier, as the other pumps serve DHW and Space heating. For service Hot water systems our baseline building comes under Table G3.1 section 11 Service Hot water systems option (b) ‘Where a new service hot water system has been specified, the system shall be sized according to the provisions of section 7.4.1 and equipment shall match the minimum efficiency requirements in section 7.4.2'. And option (e) ‘Where a combined system has been specified to meet both space heating and service water heating loads, the baseline building system shall use separate systems meeting the minimum efficiency requirements applicable to each system individually’. I can’t see where it mentions how to model the DHW pumps in the baseline building. Therefore I have used Section G3.1.3.5 Hot Water Pumps – The baseline building hot water pumps shall be 301kW/1000l/s… Therefore my Baseline service hot water pumps are modelled as 301kW/1000l/s. However when filling out the section 1.4 tables for submission the Service Hot water section states: • Service hot water pumps should be modelled identically between the Proposed and Baseline case. Is this correct? If so, in the baseline building do I model only the proposed 1.1kW CHP pump as the other proposed DHW related pumps are also linked to space heating LTHW?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 04/25/2016 - 18:29

It is correct. As you discovered the DHW pumps are not mentioned. Therefore they are not regulated, so they get modeled identically. I agree that you would only model the dedicated DHW pump identically.