FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

DHW Equipment Performance; DES Heating

Dear all, please help me with these questions: 1) I'm not sure how to specify a water heating equipment performance. In many cases the baseline building has to have an electric resistance heating of DHW. So Table 7.8 provides two options 12kW. I assume this is a DHW system peak load value. For 12kW: 20+35*√V = 1833.12 Btu/h = 0.5371 kW = 0.00105 kWh/l*day. OK but still don't know what is the heating equipment efficiency... Because in any simulation program you are required to define it of course. Should it be 100%? 2) we work on project with DES heating. It's LEED v2009 CS and we have chosen Option 1. From what I read in guidance for DES in LEED I understand that baseline heating source shall be modeled with all system parameters as specified in Apendix G if Table 3 of the guidance is not modifying it. It means that all baseline heating equipment efficiency and resets remains the same as it would be modeled without DES right? (but only for Option1) Thank you very much in advance for any help, mainly with DHW efficiency.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 04/25/2016 - 16:23

1. Size is the capacity of the elements, not the peak load. It is the volume. If it has no tank then it is an electric instantaneous heater which is not regulated. So it would be modeled identically in the baseline. 2. Under Option 1 you model purchased heat so while there may be no change listed in Table 3 you do not model a boiler and associated equipment in the baseline.