Forum discussion

NC-2009 SSc6.1:Stormwater Design—Quantity Control

Captured and Conveyed to on-site retention areas

We are having a hard time determining how to calculate the flow quantities for our site when it has been designed so all of the run off is captured and conveyed to on-site retention ponds. Is this a case where we can say that 100% of the runoff is infiltrated on-site?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 02/18/2016 - 20:26

Pre or post?

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.