The project involved the demolition of a existing building that had asbestos present on it. Asbestos were removed prior to demolition and the process was properly documented for LEED. During excavation works, a small portion of soil contaminated (with oil/diesel) was extracted, it was rejected from the landfill and moved to a special facility. A survey of this soil was not conducted. Does this mean the credit is lost or can it be achieved only by documenting this remediation?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.