FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

DES Option 1 - Baseline System Heating Type Clarification

We're using Option 1 of the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Construction" document to comply with EAp2 / EAc1. Our proposed building will utilize purchased steam and purchased chilled water from the existing central plant. Per the document, for Option 1, only downstream equipment is accounted for and the energy source is modeled as purchased energy in both the Proposed and Baseline cases. Given the size of the proposed building, system 7 will be the primary baseline system. Per ASHRAE 90.1 table G3.1.1B, this system is a VAV packaged rooftop unit with reheat and has chilled water as cooling type and hot-water fossil fuel boiler as heating type. According to table 3 (Option 1) of the DES guideline, no changes are required for system 7. Does this mean we can model an 80% efficient (per ASHRAE 90.1 efficiency requirements) boiler that uses purchased steam as its fuel source (in lieu of gas or other fossil fuel) as the heating type for baseline system 7? Would this approach still keep the DES cost-neutral, as required? Any feedback would be greatly appreciated. Thank you.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 11/02/2015 - 17:59

Nope. Both are treated as purchased energy as indicated in Table 2. There is no boiler or chiller in either model. It is the balance of system components that are modeled as a system 7 under Option 1. You basically treat the project as if it was connected to a steam plant and only model system components inside the building.