Hello, The thermal modeller scope is limited to detailed design, and at this stage Renewable energy (PV and Solar Water Heating) is still not 100% finalized / decided. Is it acceptable to present a thermal modelling report excluding renewable energies and enter separately kWh produced by renewable in leedonline form at a later stage with supporting documentation? Thanks
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.