We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels. The second through ninth floors are occupied by the school, with the remaining floors (10-35th) occupied by the residential tower.

We are designing the core and shell for the school and retail, and the entirety of the tower portion. The school interior is being designed by a separate team. The building will be built by a single contractor but the school will be managed and operated by the local school construction authority.

In this scenario, is it possible to only certify the residential tower portion of the project?