FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

G3.1.1 Exception a

I have a convention center project where it has a exhibit hall with high process load. It is larger than 20k ft2. So I don't know if I need to apply a system 5 to based on G3.1.1 Exception a or a system 3 based on Exception b (its peak load differ by more than 20 kbtu already). I guess my major question is what is nonpredominant conditions. The building is a commercial building, its just the exhibit hall has quite different load profile than the rest of the spaces (offices, meeting rooms etc). Thanks in advance

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 07/08/2015 - 16:21

Predominate condition is based on area. If the area of the exhibit hall is greater than the remaining spaces then the exception gets applied to those spaces. G3.1.1 exception (a) only applies to the two scenarios mentioned (residential or not, heating fuel source difference).

Wed, 07/08/2015 - 16:33

Thanks Marcus. Since the hall does not apply to either those scenarios, I guess I will need to use Exception b

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.