Dear All,

The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”. I have a new building in a very dense city (Paris) where the main entrance and two other facades meet the 1:1.5 requirements while the secondary entrance / façade does not. Is it possible to be awarded this pilot credit?
Regards,
Ian