Forum discussion

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles

Fueling Capacity - multiple stations

In regards to the number of fueling stations, we have a charger that can charge 2 cars simultaneously (one plug on either side), and can reach 2 spots in either direction with a long cord. When applying for this credit, would the fueling capacity be 2 or 4?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 04/22/2015 - 15:31

The credit form asks for the vehicle fueling capacity per station over an 8 hour period, so the amount of vehicles your charger can serve depends on what type of charger it is. If it is a fast charger capable of providing a full charge in 30 minutes, then it can service 16 vehicles in an 8 hour period (x2 for two plugs). If it is a Level II charger, the capacity will depend on the make and model but will be much less - if it takes 8 hours for a full charge, then your charger will only serve 1 vehicles per plug in an 8 hour period.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.