FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

ASHRAE 90.1- LIGHTING POWER DENSITY SOFTWARE.

We are currenlty in the design process of a building targetting to be LEED certified under version 3.0. As per ASHRAE 90.1:2007 requirements for LPD is mandatory, in which luminare wattage is defined as follow: The wattage of luminaires with permanently installed or remote ballasts or transformers shall be the operating input wattage of the maximum lamp/auxiliary combination based on values from the auxiliary manufacturers’ literature or recognized testing laboratories or shall be the maximum labeled wattage of the luminaire. The building façade lighting is designed with multi brightness levels, and accordingly with different power consumption based on the brightness level. The brightness level changes during the operation and in some occasions operates on the full wattage. When calculating the LPD based on the full brightness the value exceeds the maximum permitted by ASHRAE90.1:2007, however, the system software has a facility to limit the brightness at any time to a maximum of certain value (i.e. 50% in our case) to maintain the LPD as per ASHRAE requirements. Is lighting power reduction using the software acceptable by ASHRAE90.1:2007 and projects targeting LEED for new construction Version 3.0 or not?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 04/15/2015 - 15:09

The LPD must be determined at the maximum brightness/full wattage. In order to claim something less than that you would need to somehow provide assurances that the system setting will never change. Simply stating what the settings are and that they won't change may not be enough. How can you assure USGBC that the control setting cannot be changed in the future? The best option is to design the system to comply and not have to rely on seeking a way around the requirements. Keep in mind that the exterior lighting is a mandatory provision and you must comply in order to meet this prerequisite. This is an area where you do not want to be cutting it close.