For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Modeling Radiant Panels with DOAS

Since eQUEST is unable to model dedicated outdoor air system linked to the radial panels, we modeled DOAS units by creating “dummy zones” within the model. Does this simulation method require an exceptional calculation or is it enough to explain it in the input summary report, attached to the EAp2 form? Thanks.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 03/24/2015 - 16:14

Technically all work arounds are supposed to be performed as an exceptional calculation according to G2.5. We try to apply some common sense to whether exceptional calculations are needed or not. In this case an exceptional calculation does not make any sense. An exceptional calculation requires three models, baseline, proposed without and proposed with. If the model cannot model the situation I am not sure what your Proposed model without would model. With many situations like this there are acceptable work arounds that should be used, just explain the work around and cite the source.

Tue, 03/24/2015 - 17:19

Thank you so much Marcus!

Tue, 03/24/2015 - 17:35

Grateful to be of assistance Fabio!