FAQs about EAp2 :

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Modeling of CHP

I am working in a project that had a previous consultant and we do not agree with the way the CHP shall be modeled. The building will be served by a natural gas power generator that will operate an indirect fired absorption chiller from 17:30 to 20:30. The Proposed Case has been previously modeled with a generator operating from 17:30 to 20:30 on weekdays, and Baseline Building has been modeled without it. I understand that energy modeling for LEED does not allow this procedure. According to the latest document on this issue, Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction, from 2010, a generator should have also been modeled for the Baseline case, from 17:30 to 20:30, but assuming separate production of electricity and thermal energy. Is there a more recent modeling protocol on CHP? Is it allowed to take credit of peak shaving without CHP?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 03/04/2015 - 16:12

DESv2 only applies in the case where there is a larger plant serving multiple buildings. If your CHP is within the project then DESv2 does not apply. I am not aware of any circumstances where the CHP gets modeled in the baseline when using the DESv2 or not. There is additional guidance on CHP modeling within the Reference Guide. You can claim credit for peak shaving.

Thu, 04/16/2015 - 14:24

Hi, Marcus. Although it is not the case of a DES, the DESv2 is referenced as guidance. Refer to the Advanced Energy Modeling for LEED, Technical Manual v2.0, Sep 2011 Edition. Another document is referenced, this one for on-site CHP systems only, but I could not find it: "Methodology for Modeling Mombined Meat and Mower for EAp2/ EAc1 credit in LEED 2009" (July 18, 2011).

Thu, 04/16/2015 - 15:24

If you Google the document title it comes up (this is often the best way to search USGBC's web site) - http://www.usgbc.org/sites/default/files/Methodology%20for%20Modeling%20Combined%20Heat%20&%20Power%20for%20EAp2c1%20in%20LEED%202009.pdf As far as I know this document is not longer used as guidance. The CHP guidance in the DES and in the Reference Guide is what you should be using.

Mon, 05/18/2015 - 17:57

We have submitted a CIR for the project and according to the ruling USGBC gives credit to projects that use fossil fuel for peak shaving of purchased electric demand...

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.