Forum discussion

NC-2009 MRc4:Recycled Content

Question about cut sheets

My project uses lot of steel and that is a very large portion of the total material budget. The supplier has not provided cut sheets to confirm the recycled content of steel. My other material items with recycled content (to which I have cut sheets) does not reach the 20% by cost threshold. Do you think since 25% default recycled content is a conservative value, LEED would still accept it without cut sheets for 20% of the material cost?

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 02/20/2015 - 14:04

Magda - That is a good question and a situation I have not run into before. If any other LEEDusers have, please chime in. Here's my suggestion: Instead of not providing anything, I would backup the cost of the steel with some documentation from the contractor and then provide the Reference Guide stating the default 25% post-consumer waste value.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.