Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f. out of the 10,000 c.f. drain to the bmp, am I correct that this would be insufficient to earn this credit?