Forum discussion

NC-2009 MPR2:Must be a complete, permanent building or space

Two new buildings joined by unconditioned walkway

I have a new bus garage (maintenance and admin offices) connected to the fuel/wash building by an open air bridge (unconditioned space). The designer intends to use the bush wash reclaim system for an ID credit. Can these structures be considered one?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 01/21/2015 - 14:36

Perrilyn, The two buildings cannot be considered one. The Supplemental Guide to the Minimum Program Requirements outlines how buildings can be connected in order to be considered one super structure. I suggest you and your team look through the the guide. Hope this helps!

Wed, 01/21/2015 - 17:30

That is what I thought. Thanks so much for the quick response.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.