Hi everyone,

I’m working on a project and I have a doubt about occupancy in the EBOM.

After the measurements, we found that the air conditioning system does not meet the external ventilation levels, according to the ASHRAE 62.1-2007.

On this assumption, a new project will be studied.

The point is, the building has floors that have very different occupation, for example:

1st Floor: 50 occupants
2nd Floor: 200 occupants (tenant is an English language school)
3rd Floor: 14 occupants
and other ...

When the project is developed, the premise can not consider this wide range of occupants.

My question is, assuming that the project will meet the IEQp1, the project can be considered a standard occupation? For example, using the occupation of 50 people on all floors.

What should I do in this case?