The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Baseline System configuration for mixed use condominium

We are working on a 10 story mixed use building consisting of approx. 11,705 SF of conditioned retail, office and support areas, common lobbies and utility areas on level1 and clubroom and fitness areas on level 10; 56,242 SF of conditioned residential condominium spaces located on levels 5 thru 9; 9,885 SF of conditioned residential corridors and elevator lobbies located on levels 5 thru 10; 2,998 SF of unconditioned stairwell throughout the building; and 64,524 SF of parking garages extending from level 1 through level 4. The building's total area is approximately 145,354 SF. We intend to clearly treat the conditioned residential condo spaces (56,242 SF) separately in our energy model as residential system 2 units, in accordance with ASHRAE 90.1-2007 user's manual and exception (a) to section G3.1.1 of Appendix G. According to table 3.1.1A & B of Appendix G, however, the conditioned non-residential portion of the building (21,590 SF) should be treated as a System 8, not because of the total conditioned floor area (1st FL. & 10th of 11,705 SF + 5 thru 10th FL. corridors & Elev. Lobbies of 9,885 SF = 21,590 SF

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Sun, 11/02/2014 - 23:51

Residential is the predominant system so none of the exceptions apply to it at all. Any exceptions must be to the residential since it is predominant. You cannot claim exceptions relative to non-predominant parts of the building (like you are trying to do to justify the separation of systems to avoid a system 8). Here is a suggestion - Include all spaces associated with the residential (lobbies, corridors, etc.) as residential. Then apply exception b to the areas on the 1st and 10th based on a difference in schedule.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.