Dear Sirs, I just want to double check if we need to commission, as part of the LEED PRerequisite / Credit, the following systems: 1) Pumps for water distribution, irrigation, sewage, and fuel 2) Firefighting systems 3) Low Current systems 4) UPS Systems 5) Vertical transportation (Elevators) 6) Water treatment plan 7) Distribution system for chilled water, domestic water heating, or electric power Many thanks!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.