Based on my interpretation of Option 1 for this credit, it seems as though project teams are being asked to evaluate the 95th percentile (or 98th percentile) rainfall event in isolation. Much of the complication around modeling LID measures comes into play when you consider rainfall events that might lead up to your design storm. When evaluating the effectiveness of LID measures such as a cistern or even a rain garden, can project teams assume that they are empty/dry when the rain hits?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Michael DeVuono
Regional Stormwater LeaderArcadis North America
LEEDuser Expert
187 thumbs up
April 21, 2015 - 1:55 pm
Non-structural BMPs (raingardens, infiltration basins, etc.) should be modeled as dry, and able to dewater within 72-96 hours. Consult with your local jurisdiction on their dewatering requirements.
Cisterns are a tad bit different. You will need to determine the demand for water reuse and size appropriately. If you are using for reuse, your cistern will likely be designed to hold a much greater volume of water than that which is generated by the low-level storm events. Your cistern should always be equipped with some form of bypass as well.
ethan adams
UUSC4 thumbs up
April 29, 2015 - 11:26 am
Thanks Michael for the reply. I understand the functional need for a cistern larger than one used strictly to capture the single rainfall event, but I am very space-restricted because of the cistern location and am wanting to be certain that what I install for storage capacity will meet requirements for the credit (I'll only have one shot at it; adding on if I undersize won't be an option). I intend to reuse for toilets and cooling tower.
My 2-year, 24-hour rainfall capture requirement is 3,000 gallons. Can I assume a dry tank at the start of the rain event to qualify for the credit and install just a 3,000 gallon tank? Or will they require larger capacity, based on the assumption that there is already at least some amount of rainwater in the cistern before the rain event begins? Lastly, if they DO require more capacity, how would I know how much more?
Thanks a lot!
Michael DeVuono
Regional Stormwater LeaderArcadis North America
LEEDuser Expert
187 thumbs up
April 29, 2015 - 1:59 pm
Ethan are you referring to V4 or 2009?
I am assuming 2009, because you reference the 2-year 24-hour storm. Calculate the delta volume for pre and post 2-year storms. That is what you need to meet the volume requirement. As for rate you need to develop the hydrographs and show that reduction.
Keep in mind, I'm not a GBCI reviewer, and this guidance is only that. If you need this to certainly comply, I suggest you contact GBCI via their inquiry page and discuss this with them.