FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Ventilation - Proposed and Baseline per ASHRAE 62.1-2007?

Hi! I am conducting a LEED v2009 EAp2/c1 energy model for a nonresidential building that is more than 5 floors. The proposed system is a water source heat pump system (WSHP) with natural gas boilers. Per Tables G3.1.1A&B of ASHRAE Standard 90.1-2007, the baseline system is a System 7 – VAV rooftop with Reheat. My question involves the ventilation rates for the proposed system vs. the baseline system. Per section G3.1.2.5 of ASHRAE 90.1-2007, minimum outdoor air ventilation shall be the same for the proposed and baseline building designs. Furthermore, per LEED v2009 IEQp1 Minimum Indoor Air Quality Performance for New Construction/Mechanically Ventilated Spaces, the proposed building’s mechanically ventilated systems must be designed using the ventilation rate procedure in ASHRAE Standard 62.1-2007. If the baseline VAV system is designed using the same ventilation rate procedure in ASHRAE Standard 62.1-2007, the baseline ventilation airflow rate is different (i.e. much greater) than the proposed ventilation airflow rate. The reason behind this is the larger sample size of system ventilation efficiencies for the VAV rooftop unit; this is because a VAV rooftop unit serves more spaces than a horizontal WSHP. The energy cost needed to condition the outdoor air is much less for the proposed WSHP design, which significantly improves (decreases) the proposed building’s annual operating cost over the baseline’s. Since I am choosing to use a WSHP system for my proposed design, shouldn’t I take the code-required ventilation advantages into account when conducting my model? Please let me know what you think. Thanks,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 06/17/2014 - 13:46

The baseline does not use the same procedure for ventilation, it uses the values as calculated for the proposed case. The proposed outside air is modeled as designed. For most baseline systems you simply use the same cfm of outside air. If the proposed system has demand controlled ventilation you again model the proposed as designed. The baseline is the ASHRAE 62.1-2007 calculated value based on the corresponding proposed system. Always remember that the baseline systems are never "designed".