Forum discussion

NC-2009 EAc1:Optimize Energy Performance

Educational Building with small greenhouse at exterior

We have a large institutional project with a small greenhouse facility at the perimeter of one of the classrooms. The greenhouse is part of the building envelope, but the systems are separated to preserve the greenhouse environment. How should the energy model address this piece? It is along the exterior of the building, is it acceptable to exclude this area?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 06/09/2014 - 17:10

Kristina, Is the greenhouse part of the current project scope? We have a project with a greenhouse on the roof, but since it's going to be built during the next phase after the building with a different funding structure, we are able to exclude it from current LEED boundary. If you include the greenhouse in the current LEED boundary, you are required to include the greenhouse process loads which is likely to have an adverse effect in your modeling.

Mon, 06/09/2014 - 19:11

If it is in the project it must be modeled. You cold probably argue that it is a process load and model it identically in both models. On a large institutional project the effect should be very, very small. Instead of asking for exclusions, seek better solutions.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.