Forum discussion

Purchased Energy Rate

We are working on a project consisting of several offices and residential buildings, but LEED boundary is considered only one of the office building. There are 4 ground source heat pumps intended to provide heating and cooling for the whole project, which is considered as "upstream equipment". therefore, we are thinking to follow option1 or as an alternative path applying ASHRAE 90.1-2007 addendum ai. However, I'm confused how to determine the purchased energy rate when the local purchased energy rates is not available. The rates must account for the total costs associated with maintaining the district equipment, and generating and delivering the energy to the project site. Do I need to create another testing model that includes all the buildings outside the LEED boundary to calculate the performance (cost $ /electricity consumption KWh) of the upstream equipment? Or is there any other method to get the rate? Thanks in advance.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 12/11/2014 - 15:00

You do not need to create a model that includes all the buildings. The way you calculate and determine the rate is spelled out in section 2.4.2.1 of the DESv2.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.