I am stuck on this LEED BD+C question. The future building tenant decides to increase the outdoor air ventilation rates by 30% compared to the ASHRAE 62.1-2007 standard in a mechanically ventilated building. Which of the following statements are true? (Choose 3) -The requirements of the Increased Ventilation credit are met -The Air Handling Unit flow measurement alarms need to be recalibrated to the new design rates -The total green energy purchase required for the Green Power credit must be recalculated -MERV-13 filters must be installed -The minimum distance between smoking areas and air intakes has to be 30% higher -The breathing zones need to be redefined to comply with the Increased Ventilation credit Apparently the green power is one of the answers- is that an error? I don't understand why it would be an answer.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.