FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Energy Recovery for Baseline Air Handling Units (LEED 2009)

My proposed design has multiple AHUs supplied from a dedicated outside air AHU (DOAS) . The DOAS will be over 20,000 cfm and will have energy recovery. The baseline system will be Packaged VAV System 5. Should the baseline system be provided with a DOAS with energy recovery, or is each baseline system considered independant, in which case energy recovery will not be required since each unit will have less than 70 percent OA? Thank you, Craig

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 02/17/2014 - 09:47

The key is to keep the ODA min amounts the same in both baseline and designcase models. With DOAS the designcase usually dictates the minimum amount of ODA required zone wise. This same requirement falls to the baseline case. The baseline case is not modeled as a DOAS system, but you may find that for some zones there may be little or no recirculation air as the ODA amounts may be far more than the required minimums of ASHRAE 62.1. It does present some trouble. I suggest making a table with the ODA fractions for the zones at design conditions, because if you have a zone that requires little or no ODA, but does require air for conditioning, it may receive too much ODA as the ODA fraction is set at the central AHU ODA mixing damper to accommidate all the connected zone ODA requirements which may be zone volume flow weighted. Like zones should be grouped. You may need to take a closer look at G3.1.1 Exceptions.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.