Forum discussion

NC-2009 IDc1:Innovation in Design

Recycled water for Cooling Tower

Hi, our project is using 100% recycled water for cooling tower. Is this eligible for an ID credit? If so, can we submit the credit at construction review stage since we've already submitted for design review? Thank you.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 02/11/2014 - 20:31

No I do not think so, as there are other credits in the Pilot Credit library that could apply, and this very topic is a feature of v4. I recommend taking a look at PC17 and PC18 as options to gain a credit for your system. We too have been using more condensate from cooling coils for make up to cooling towers along with good chemical monitoring and treatment.

Tue, 02/11/2014 - 20:44

The project submittal tips document on www.gbci.org says you can pursue LEED EBOM WEc4.1 Cooling Tower Water Management for an ID point on a LEED NC Project. One path for earning this credit requires that makeup water consist of at least 50% nonpotable water. There are some additional requirements here http://www.usgbc.org/node/1732143?return=/credits/existing-buildings/v2009/water-efficiency

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.