The SSc7.1 credit form gives you the option to either manually enter the SRI if you know it, or to enter the emittance and reflectance values and let the form calculate for you. The BD+C reference guide indicates that new gray concrete has an emissivity of .9, a reflectance of .35, and an SRI of 38. Yet, when I enter the emissivity and reflectance on the credit form and click calculate, I am given an SRI of 99.8. Is this a glitch in the form or am I missing something?