We are working on a medical center in Mexico to be certified LEED EBOM and it is currently under construction. We would like to advice the contractor on which systems need to be installed before completion so when the building is under performance period no major renovations are required.
Can anyone confirm the level of submetering required for all energy uses? The current scheme that is being built has BMS for HVAC and all electrical systems, plus the utility meters for all electricity and gas consumption. Can anyone confirm if to comply with EAp2 and EAc1 if further submetering is required, for example lighting, equipment, pumps, hot water , etc will need to be separetaly submetered to comply with the criteria?