Could someone please clarify the following for me? Am I interpreting the language correctly to require: - (1) designated recycling storage area, sized appropriately based on the recommended sf in the reference guide in addition to other smaller collection and storage areas through the building; so in effect, I need (1) designated space at a certain sf, rather than designing for that same sf in aggregate for the project - Our project is a small new building/addition that physically connects to another existing building that already has a large space designated and used for collection and storage. Can I claim this space as the designated recycling storage, or am I required to provide a storage location within our LEED project boundary?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.