FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Baseline for hospitals

Hej! As there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for hospitals?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 10/15/2013 - 14:08

I am not aware of one for hospitals.

Tue, 10/15/2013 - 14:47

Many thanks for promt reply. Do you know about any guideline for procesenergy in LEED hospitals? I find that there is very little information available about this.

Tue, 10/15/2013 - 15:21

Medical equipment is a tough one. I am not aware of any baselines for it. Some of the other process loads in a hospital, like office equipment, etc., have established baselines. Have you checked Energy Star (before the shutdown)?

Tue, 10/15/2013 - 15:46

I didn't check Energy Star, but I guess then I have to wait until after shutdown (: I have not worked with Energy Star yet, and the project country is not US - but it would be great to get some inspiration. Where would you suggest to look (meaning can I just go on the Energy Star website to find out?) Many thanks.

Tue, 10/15/2013 - 15:48

Check under commercial products. You should also check out COMNET. They have established some process load values which could possibly be used as a baseline. Not sure how this plays outside the US however.

Tue, 10/15/2013 - 15:50

Thanks!