Hi, does anyone here have ever implement flush out in a tropical climate area (climate zone 1 --> high temperature and humidity) and succeed obtaining this credit point? and what flush-out strategies we can consider for building without mechanical ventilation system? For the reference, the building is only served by natural ventilation (window openings) and the AC system is a VRF system (ceiling cassette type), which is a multiple AC system that can operate independently. Thank you.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.