Dear Leedusers, our project will install a retention tank which will collect storm water from the whole LEED area. The retention tank will provide water for flushing toilets and watering greenery. Even though the size of the tank is about 240 m3 (8500 cf) it is possible that during 2-year 24 hour design storm some of storm water will be drained to the municipal drainage system. According the LEEDonline it seems that all BMP's contain WC flushing and it would be TSS removal rate of 100%. I don''t think that we can state 100% total weighted average TSS removal efficency when some of the stromwater could be drained to the municipal system during some non-standard storms. I would be grateful for any suggestions or experiences. Jiri
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.