FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

U-factor for existing masonry wall

Hello All In this LEED_CS project, the existing masonry wall was changed to the following configuration (from outside to inside): - glass-fiber-reinforced concrete panels [TAKTL] on galvanized steel furring channels - existing 8" masonry wall - 3" polyisocyanurate insulation (R-18) - 1/2" air space - 3-5/8" metal studs without thermal insulation - 5/8" gypsum wall board Per ASHRAE 1.4.1 Tables “Opaque Building Envelope Constructions” requirement, proposed construction assembly U-factor should be as-designed and consistent with Appendix A of ASHRAE 90.1. I cant fined any table in Appendix A to match this configuration. How should I select the U-factor for this wall? Thank you so much for your help, Morteza

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 08/23/2013 - 19:42

Find the closest one and extrapolate. Be sure to read the text as the tables include assumptions about the construction. There is a table for block walls with steel framing and continuous insulation. Compare the assumed exterior finish to the one you have to see if there needs to be an adjustment.