FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

C&S for a mixed use building

Dear forum, We have a project that is seeking the C&S LEED Certification. The building will be a high-rise building, the first 5 levels will be for retail use and from floor 6th to the top it will be for office use. The building also has 12 underground parking levels. The decision was to Certify only the office area of the building, not the part that will be used for retail. There are 7 parking levels that will be used for office users and the rest of the levels (5) will be for the retail users. My question is, can we include all parking levels in the energy model, even if the retail area will not be included? The reason we want to include it is that the lighting design for the parking will have a lower LPD than the allowed LPD for the baseline model, so adding all parking levels will give us more lighting savings. Thank you in advance

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 08/20/2013 - 19:54

Check the MPRs on what you can and can't submit when attempting to exclude a portion(s) of a building. To be brutally honest Santiago what you describe sounds like you are just trying to game the system. Include part because it helps, exclude another part because it hurts. Why exclude the retail, especially since it is a CS project where the tenant use is neutral? IMO opinion do the whole building or nothing at all.

Tue, 08/20/2013 - 20:35

Thank you Marcus, The reason we thought not to include the retail area was because the owner did not want to implement any efficient envelope in that part, only in the office area, so it will not help to achieve the EAp2 pre-requisite.

Tue, 08/20/2013 - 21:20

The envelope performance is not a mandatory provision so it would not preclude you from attaining EAp2 unless your savings are so low they can't meet the minimum percent savings.

Add new comment