hi there, here's what will probably be an easy question for you but is stumping me, as this is my first time documenting this credit. the form calls for each BMP documentation to input the percentage of site that is being treated. do I need to account for the entirety of the LEED project site, in terms of each BMP treating a percentage thereof? or do I only need to account for the portion of the site that contains impervious surface? the development site for our project will be made up of landscaping and pervious paving, with the only impervious surface being the roof. The roof runoff is all being treated in rain garden(s). If I do need to account for all of the landscaped and pervious paving areas on the form, is it safe to assume they are removing 100% of TSS? The Hydrologic Soil Type for the site is "C", which has me worried. Thanks!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.