Our Project is applying for M&V plan option D method 2, which let us calibrate the energy model with post construction measures. Because of the electrical circuits we can measure the total building consumption, and individually the HVAC and Elevators consumption, while the lighting, pumps, and common areas services consumption can be estimated by calculating the operation time controlled on each item. Is it valid to calibrate the energy model with these methodology?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.