If I take the default 45% of contract price for divisions 3-10 just in the concrete and steel my totals are 80% plus for recycled content and regional materials. Even if we used actual numbers for prices I would think we are much higher that that. Do I need to list every item out for these even though I am so much over the required total? My list is just getting very long.