Forum discussion

Phased Project Executed Under Different Construction Contracts

After having registered our project (LEED NC for Schools) it was determined that the building would be constructed in two phases, one right after the other, with Phase 1 being occupied while Phase 2 is under construction. Additionally it is possible that the two phases will be completed by different contractors under different contracts. If the two phases are constructed under different contracts, can the building still be registered as a single project? Or will we need to register a group project and document each phase individually? Thanks for your help,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 06/27/2013 - 04:28

I think that if it is a single building it should be treated as a single project . You should get the documentation of both construction phases though. A group project would work for a school with two different buildings.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.