EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy

On Site Renewable

The project would like to consider this credit. For that a PV system was previously installed and has been in operation within the performance period. The renewable energy system generates energy to help reduce the overall reliance on traditional energy. However, the total on-site renewable energy is only 2.3% of the total energy used. What should the project team do to obtain this credit and still make use of the benefits of the PV system even if the production is less than the 3% required to obtain 1 point? thanks

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 08/30/2013 - 15:44

You could pursue the option to use a combination of on-site and off-site renewable energy to meet the credit requirements. Otherwise, I guess you would need to reduce the overall energy use of the building or add more on-site renewable energy capacity.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.