FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

illuminance level of lighting power density of ashrae 90.1

ashrae 90.1 give the LPD of different space. But i want to know what the correspondent illuminance level is. if there is a project whose illuminance level is higher than the ashrae 90.1,the lighting power is higher accordingly. but the baseline model use the LPD of ashrae 90.1 which correspond the lower illuminance level .it is unfair to our project. what do you think?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 05/30/2013 - 14:40

IESNA worked with ASHRAE to develop the lighting power density values. It is assumed that the LPD can be delivered while meeting the IESNA recommendations for illuminance. The amount of illuminance is not covered by 90.1, that is up to your local/project requirements.

Fri, 05/31/2013 - 02:05

Thanks for your reply. but there is one point i do not know well. For example the LPD of 90.1 for office is 12w/m2 in baseline modeling,corresponding 400 LUX .but our project is 500LUX and the lighting power is 14w/m2 higher accordingly. can we adjust the LPD of office to 11.2 in proposed modeling multiplied by 0.8?

Fri, 05/31/2013 - 14:57

No you cannot adjust the baseline LPD because you have a higher illuminance level.

Mon, 06/03/2013 - 09:29

According to your reply,the baseline LPD cannot be adjusted. but i want to ask whether the proposed LPD can be adjusted. For example the LPD of 90.1 for office is 12w/m2 in baseline modeling,corresponding 400 LUX .but our project is 500LUX and the lighting power is 14w/m2 higher accordingly. can we adjust the proposed LPD of office to 11.2 in proposed modeling multiplied by 0.8?

Mon, 06/03/2013 - 13:54

No the proposed must be modeled as designed, without any adjustment. If you choose to increase light levels the actual wattage must be modeled.