FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Revise of load input in Proposed case prior to Appeal

Hi, Our project has received a denial for EAp2 and we intend to appeal. While following the recommendations of the reviewer for some unsolved issues, we realized that the equipment load we had assumed for a Core&Shell building is rather high in comparison to the recommendation of User's Manual Table G-C. Can we revise the equipment load input refering to User's Manual recommendation for Core&Shell buildings prior to an appeal? Note that this revise leads to an increase of cost savings, and an increase of points.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 05/28/2013 - 14:19

You can change it. Make sure to explain why you changed it and the assumptions you used.

Tue, 05/28/2013 - 15:03

What happen if recommendation CS appendix 2 Table 1. Default tenant Receptacle load is less than 25% of total cost. Do we have to increase the process load to show overall process load is 25% of total energy cost. Please advice Thank you Anil Bhari

Tue, 05/28/2013 - 15:15

You are required to model the receptacle load as accurately as you can. If it is unknown and you use an acceptable source for this load and are under 25% just provide an explanation as to why you are under 25% process. NEVER ARBITRARILY INCREASE PROCESS LOADS TO GET TO 25%!