NC-2009 WEc1:Water Efficient Landscaping

WE C1, Option 2, Path 2 submittal requirements

If a site will have no irrigation installed (permanent or temporary) is one still required to complete the baseline and design case information as part of the submittal requirements (tables WE c1-1 and 1-2)? Or is the narrative under "No Permanent Irrigation" the only required data upload (in addition to drawings)?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 05/22/2013 - 11:51

You do not need to complete the calculator you just need to upload the plan and get the owner to sign the form committing to no potable water use. If you meet the "no potable water" goal by using non-potable water for irrigation you do have to complete the calculator.