Hallo,
My team and I have reduced water use in a project through high-efficient flush fixtures by 39%.
In addition, 100% of the water used for sewage conveyance is treated on-site to tertiary standards and reused for toilet and urinal flushing.
The standards of this car manufacturing company states that every new building has to treat 100% of waste water. Therefore meeting requirements were easily achievable.
GH