Im trying to find out what would be considered process loads to be metere separately, is there a definition from LEED? Would loads from Water distiller, Sterilizer, Fume hood, Commercial dishwasher, Water purifier be considered process loads?
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up