Forum discussion

NC-2009 EAp3:Fundamental Refrigerant Management

Campus setting uploading refrigerant data LEED letter template

Hello, This is a sort of how to LEED Online question. We have a resort campus setting. There will be several different sizes of guest villas as well as public spaces and staff facilities. We will have many different models of equipment using refrigerant as a result. In the campus setting does the same model with refrigerant that is say being used in 15 buildings of the same type, in the same space, have to have 15 lines entered on the LEED letter template? Or is there a quantity feature in the master site set up? If the same model were used in say 11 different types of spaces I would assume it has to have 11 lines inputted into the Letter template? I am trying to get an idea of the amount of work required for my engineers for the project.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 11/04/2013 - 17:27

John, do you have an update on this problem? This is not a common situation for project teams, so I think we could all learn from your experience. In general, submitting written documentation (with support) such as a narrative that documents the refrigerant for reach type of equipment on the resort, will get you around the limitations of the credit form.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.