The credit mentions that pressurized entryway vestibules are required for high volume building entrances but I don't see on the template where this information is entered. If the vestibule is not pressurized, can this credit be achieved?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Healthcare buildings are designed with certain pressure relationships between spaces. I would work with the mech engineer and address this I the narrative section.
This is probably too late for you, but the form has been updated to include this requirement.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.