FAQs about EAp2 :

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

System #7 for undesigned space

I am working on a residential building, with more than 20,000 SF of conditioned non residential spaces, so I am using System #7 for non residential spaces. I also have spaces with no HVAC system designed yet (spaces that shall be rented/leased). 90.1-2007 calls for each floor to be modeled with separate HVAC system for systems 5,6,7,8. Do I include my rented/leased spaces under the same VAV system that serves the rest of the floor, or should I create separate HVAC systems for these spaces? Also, does the one-system-per-floor rule apply if I have some single height spaces and some double height spaces on the same floor?

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 01/17/2013 - 21:44

Model it as part of the same per floor baseline system. The trickier part sometimes is having to model this system in the Proposed for those spaces as well. The rule applies. It is per floor not per height or volume.

Fri, 01/18/2013 - 14:28

Thank you, Marcus. I had another unrelated question - in one of my projects, the LEED reviewer mentioned that I am allowed to use Systems #9 or #10 from 90.1-2010 for spaces with heating only. I want to apply these systems now on a different project. Is there any LEED CIR or ruling that allows use of these two systems for LEED 2009? I know these systems are also included in 90.1-2007 addenda, but LEED Reference Guide mentions using 90.1-2007 with errata but without addenda.

Fri, 01/18/2013 - 15:13

I would have to go digging through the Interpretations, Reference Guide Addenda, etc. to try and find it. Don't know where it is off the top of my head. I can tell you that the reviewers allow the application of addenda to 2007.

Fri, 01/18/2013 - 15:35

The interpretation you are looking for is #10130. In general, projects are always allowed to apply addenda, they are just not required to. If a particular addendum is applied, all aspects of it must be applied; projects cannot pick and choose within one addendum, though they are not obligated to use all addenda.