FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

EAp2

The project is a railcar vehicle maintenance facility (VMF) a couple acres large. This project falls under new construction and includes a new rail track to be brought into the VMF. I am unsure if the track is complete prior to the start of VMF or both at the same time. The project team is under the opinion that LEED is not obtainable. This opinion stems from the large amount of process loads (rail track power) used to move the rail cars within the building and believes these process loads shall be included within the energy model. In addition, the rail track power is used to power the building. However, the rail track power is tapped and stepped down to the VMF building through the use of a substation outside the project boundary. If the process load was included within the model, reducing energy use by 10% to meet the perquisite EAp1 would not be feasible. For example, let's pretend the client decided they wanted to cough up the dough for solar to power 25% of the building being a portion of the usual hvac, lighting and plug loads and tap into the track power for the remaining 75% building load. In my opinion, the energy model should reflect only those inputs noted above and any additional rail track power usage from moving the rail cars within the building shall be left out of the energy model. Perhaps an argument could be made that any track power related to moving rail cars is considered a constant necessity since its connected and ran off a source of power out of the project boundary, which is not affiliated with the building loads. If the LEED requires the process loads to be modeled its basically the same as requiring an indoor bus depot to reduce the power consumption required to run the bus engines.. Any insight, similar experiences or opinions you could shed on this would be much appreciated.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 11/30/2012 - 16:55

Interesting question. Make sure the project meets all the MPRs. I would ignore the energy the rail cars use. Trying to capture that would be like tracking the fuel use by cars as they exit an office building's parking garage.

Mon, 12/03/2012 - 16:53

Technically if this is metered electric use associated within the building then it should be counted. I would suggest that you submit a LEED interpretation as this could be a grey area.

Thu, 12/06/2012 - 14:46

Thanks for the response both of you. Marcus, the whole reason for this post was to get an idea if the project should pursue LEED. If the prerequisite is not obtainable then obviously LEED is not. Furthermore, submitting a CIR is not possible if the project is not registered.

Thu, 12/06/2012 - 15:06

Hi George, You can try to contact USGBC/GBCI in an email through their contact info on the website. Although the project is not registered, they might help. Kind regards, Adrienn

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.