FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

G3.1.2.10 Exceptions: e.

This applies to cooling only type systems? That means if the proposed system can heat and cool and is in said climate zone, then this exception may not be applied. Right?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Sat, 11/24/2012 - 20:40

If the system does both heating and cooling - I would say this exception can be applied. My logic is that it is still a cooling system. Certainly could be confusing - any other thoughts?

Tue, 11/27/2012 - 19:49

kW savings from the heat recovery device is usually more in the heating case than in the cooling case, therefor my logic was that in milder climates where more focus floats to the cooling side, using heat recovery becomes less important. If your building was needing cooling facilities only, then the heat recovery device may fall away due to first costs and payback times. Current project is not using this exception because (although in the climate) it has both heating and cooling facilities. I err on the side of caution.

Wed, 11/28/2012 - 14:59

We agree that your approach is conservative and cautious. Check out the User's Manual as it provides some clarity (see page 6-81). If you have a combined system both must be exempt to apply the exception (only happens in CZ 3C) across the board. So in a combined system both exemptions d and e must apply to be exempt across the board. If only one exemption applies and the other does not then the exemption cannot be claimed. Note that a bypass is required in many cases so you should bypass in cooling mode if exemption e applies. The milder climate zones on the list are marine so probably exempted due to humidity issues. The others are the colder climates.

Thu, 11/29/2012 - 10:35

Bypass is required for the heat recoverer an any event. We control the bypass per enthalpy both in cooling and heating modes.